Page 1 - Motor Truck Scale

Instruction ManualTITANMotor Truck ScaleModel: 6020 SeriesFAIRBANKSS C A L E S 50745Revision 5 03/10© 2004-2010 by Fairbanks Scales Inc.All rights

Page 2 - Amendment Record

OPTION 1: Set the module directly on the locating tools and the blocks will act as safety stands. • Install a load cell bearing cup with "O"

Page 3 - Table of Contents

4. Before releasing cable tension• Check the alignment of the end modules to the center or base module and tothe end wall. • Using the provided shims,

Page 4 - 50745 4 03/10 Rev. 5

7. Base Plate Completion:• Check that all locating tools are properly aligned and flush with the receivercups. Drill the holes for the base plate anc

Page 5 - Section 2: Description

d. On the bottom of the load cells there are two flatsides which must be alignedwith the flats in the lower cup. Carefully lower the scale while seat

Page 6 - 50745 6 03/10 Rev. 5

A. Introduction The Titan scale was designed to be used with Intalogix™ systems. Intalogix™ systemsutilize smart sectional controllers (SSC) and pit p

Page 7 - Section 3: Installation

c. Smart Sectional ControllerWire cells into each section’s sectional controller per the appropriate service manual.Refer to the Appendix for typical

Page 8 - CABLE HOLES

d. Grounding - Smart Sectional ControllersIntalogix™ systems must have two (2) ground rods in the foundation for properconnection. Pit power supplies

Page 9 - 50745 9 03/10 Rev. 5

50745 17 03/10 Rev. 5A. Scale Maintenance1. Check for accumulations of solid material under the scale which may affect theaccuracy, i.e., ice, froze

Page 10 - 50745 10 03/10 Rev. 5

A. Parts ListPart No. Description75458 11/8" - x 41/2" w/ nut (module - module)54788 11/8" lock washer (module - module)54255 11/8"

Page 11 - PANEL CONNECTION DETAIL

C. O-Rings, Actual Size50745 19 03/10 Rev. 5Part No. 64340ANSI # 228Outside of all load cell cups2 1/4" I.D.2 1/2" O.D.1/8" Thickness

Page 12 - 50745 12 03/10 Rev. 5

Amendment RecordTitan 6020 Series Motor Truck Scale50745Manufactured by Fairbanks Scales Inc.821 LocustKansas City, Missouri 64106Issue #1 01/04 New

Page 13 - CHECKING DETAIL ELEVATION

A. Field Installed Rub Rail Installation • Disconnect all loadcells. Electrically isolate the load cells from the platform. • Use the print with the

Page 14 - 50745 14 03/10 Rev. 5

50745 21 03/10 Rev. 5Foundation InspectionFOUNDATION FIELD CHECK LIST(Field Form) A Foundation Inspection should ALWAYS be performed p

Page 15 - Scale house

50745 22 03/10 Rev. 53 _____________4 _____________1 _____________ 2 _____________CLconcretenailsBCCBAB = 1/2 of the coping length OR CenterlineLoad

Page 16 - 50745 16 03/10 Rev. 5

50745 23 03/10 Rev. 5Appendix II: Wiring12345678TB112345678TB112345678TB112345678TB412345678TB312345678TB212345678TB212345678TB312345678TB4Indicato

Page 17 - Section 5: Maintenance

Table of ContentsSection 1: General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Section 2: Description . . . . . . . . . .

Page 18 - Section 6: Parts List

This Instruction manual provides installation instructions for the Fairbanks Titan ModularSteel Deck Truck Scales.For assurance of correct Titan scale

Page 19 - C. O-Rings, Actual Size

The Titan Modular Steel Deck truck scales are available in various lengths from 27 to 105feet, and widths from 10 to 14 feet. The scale is made up of

Page 20 - Section 7: Accessories

50745 6 03/10 Rev. 5Titan Steel Deck Truck Scale 6020 Series 100K CLCL W CLC CapModel Scale Weight feet feet Klbs tons SecPLT-6020-T04 89801 12800 2

Page 21 - Foundation Inspection

Installation consists of the following:• Foundation check, layout, and base plate setting• Tools, materials, documentation, and a crane• Setting the m

Page 22 - Lateral Layout

B. Foundation:Before installing any part of the scale, the foundation must be checked for accuracyusing Foundation Inspection, Field Check List, FF-22

Page 23 - Appendix II: Wiring

C. Setting the Modules1. Preparing The Modules For Lifting• The module(s) are complete with channel pieces welded to the sides forattaching lifting ho